Campbell Station Road Project
Would the FBMA please justify their extension of Campbell Station road?
For those of you who don't believe me, just head over to the Knox County Library in Farragut and just sit in the parking lot for 20-30 minutes during rush hour or before/after school and watch. If you're not convinced, comment and say why.
--
There are anonymous comments allowed. But be prepared to have your comment edited.
- Why create a "cut-through" that by-passes a significant portion of our businesses?
- Why does it need to be 5-lanes?
- Are there plans to expand the section of CSR between Kingston Pike and Grigsby Chapel?
- If so, then why increase the danger to our Primary School Children, Library and Park patrons as well as our High School Students (the back entrance to Farragut High is on CSR).
- If not, how are you going to control the speed and safety on this section of road as drivers already do things to "cut-in" when it goes from 5-lane to 3-lane (including speeding way over the limit)?
For those of you who don't believe me, just head over to the Knox County Library in Farragut and just sit in the parking lot for 20-30 minutes during rush hour or before/after school and watch. If you're not convinced, comment and say why.
--
There are anonymous comments allowed. But be prepared to have your comment edited.
0 Comments:
Post a Comment
<< Home